Time speed, work, Alligations and mixtures problems - Page 2
PaGaLGuY.com - The Everything of MBA, CAT 2008, GMAT, XAT, IIM
         Home          MBA Forums         PG Office Blog         Contact Us         About Us                  Jobs @ PG
Exclusive Bschool Content:      Interviews      B-School Watch     MBAs speak     Placements     GMAT & MBA Abroad      Form Notifications
» Sponsors





Go Back   PaGaLGuY.com - The Everything of MBA, CAT 2008, GMAT, XAT, IIM > Exam Resources > Quantitative Questions and Answers

Notices
Quantitative Questions and Answers Discuss Quantitative and other Math related questions. Post your math doubts and get it solved by the smartest brains this side of the universe !

Tags: , , , , ,

Reply
 
LinkBack Thread Tools Display Modes
help in DI
Old
  (#11)
eagles_dare13
has no status.
Trainee PaGaL
 
Status: Offline
Posts: 90
Groans: 0
Groaned at 3 Times in 3 Posts
Thanks: 0
Thanked 4 Times in 1 Post
Join Date: May 2005
Age: 27
help in DI - 30-05-2005, 03:18 PM

without multiplying actually, is there a way to tell which is greater ..
say 61*94 and 92 * 65.
This comes in handy in DI.
Also , please tell me exactly how remebering reciprocals upto 30 will fhelp.
becasue i can calculate percentages by adjusting numerator and denominator until the denom is 100.
   
Reply With Quote
Sponsored Links
Query
Old
  (#12)
vkakkar
has no status.
Newbie PaGaL
 
Status: Offline
Posts: 3
Groans: 0
Groaned at 1 Time in 1 Post
Thanks: 0
Thanked 0 Times in 0 Posts
Join Date: May 2005
Age: 25
Exclamation Query - 30-05-2005, 03:18 PM

Is the answer of 2nd question "25 days".??
PLs let me know the correct answer so tht i can help.

Quote:
Originally Posted by madhavi
Questions on Time and Work

1. 20 women can finish a job in 20 days. After each day, one woman is replaced by a man or a boy alternatively starting with a man.Man is twice efficient and boy is half efficient as a woman,On which day does the job get completed??

2. A can do a job in 10 days. B can do the same job in 15 days. C can demolish the same job in 20 days. In how many days does the work get completed, if C starts the work and they work on alternate days as C-A-B-C and so on.
   
Reply With Quote
The Following User Says NO Thank You to vkakkar For This Un-useful Post:
raj.inna (28-05-2008)
Old
  (#13)
rajsher
has no status.
Addicted PaGaL
 
rajsher's Avatar
 
Status: Offline
Posts: 999
Groans: 0
Groaned at 1 Time in 1 Post
Thanks: 0
Thanked 8 Times in 8 Posts
Join Date: Jan 2005
Location: Hong Kong
Age: 25
30-05-2005, 03:22 PM

Quote:
Originally Posted by madhavi
Questions on Time and Work

1. 20 women can finish a job in 20 days. After each day, one woman is replaced by a man or a boy alternatively starting with a man.Man is twice efficient and boy is half efficient as a woman,On which day does the job get completed??

2. A can do a job in 10 days. B can do the same job in 15 days. C can demolish the same job in 20 days. In how many days does the work get completed, if C starts the work and they work on alternate days as C-A-B-C and so on.
Q1. 400 women hours r required.
there r 20 women hours every day.
If we replace by a man, then count goes up by 1 and if v replace by a boy count comes down by 0.5, so the series is--
20+21+20.5+21.5+21+22+21.5+22.5+22+23+22.5+23.5+23 +24+23.5+24.5+24+18(25)=400

so no. of days = 17+(18/25) = 17.72 days answer.


Q2. Can u clear on C's part. i mean if he has to demolish what will he do on the first day????


IN SEARCH OF A NEW SIGNATURE.........
Life me mazza kam ho raha hai.....kya kare?
COME n REGISTER on pagalguy.com
  Send a message via Yahoo to rajsher  
Reply With Quote
The Following User Says Thank You to rajsher For This Useful Post:
babaikaushik (06-04-2007)
solution
Old
  (#14)
MrAnderson
has no status.
Hardcore PaGaL
 
MrAnderson's Avatar
 
Status: Offline
Posts: 540
Groans: 0
Groaned at 2 Times in 2 Posts
Thanks: 0
Thanked 30 Times in 10 Posts
Join Date: Aug 2004
Location: unnees@IIMA
Age: 27
solution - 30-05-2005, 03:28 PM

1. 20 women can finish a job in 20 days. After each day, one woman is replaced by a man or a boy alternatively starting with a man.Man is twice efficient and boy is half efficient as a woman,On which day does the job get completed??

2. A can do a job in 10 days. B can do the same job in 15 days. C can demolish the same job in 20 days. In how many days does the work get completed, if C starts the work and they work on alternate days as C-A-B-C and so on.

1.assume total work = 800 units.
so a woman does 2 units of work in a day
man ..4 units...boy ..1 unit...

starting with 20 women intially..
day 1...40 units completed
day 2...38 + 4 = 42 units
day 3 ..36 + 1 + 4 = 41 units
day 4 ..34 + 1 + 8 = 43 units ..etc etc
day 5 ..32 + 2 + 8 = 42
day 6 ..30 + 2 +12 =44
now we hv to find in how many days this will add to 800 ...
easy way to do tht...
day 1 + day 2 = 82
day 3 + day 4 = 84
day 5 + day 6 = 86 ..etc... AP

in 18 days ... total work done = 9 (164 + 8*2)/2 = 9 (90) = 810
so work gets over on the 18th day...(u can calculate xact duration also)


2. assume 300 units of work..
so A = 30 units/day
B = 20 units/day
C = -15 units/day ...
so in a cycle of 3 days..cab total work done = 35 ...
in 8 cycles(24 days) .. 280 units .... 25 th day .. -15 ..so 265 ..then +30 ...295
on the 27 th day 5 units remaining..and B finfishes 20 units per day..
so in 1/4 of the day he will finish the work...
so ans 26.25 days.

edited: saw rajsher's post only after posting...good point..wht did C do on day 1....
did he mess things up so tht A had to do some cleaning up b4 starting work??
..int ht case my soln is right..else.. we hv to take day 1 as 0...and count taking
nxt 3 days.....so ans wud be..25 2/3 as given...
andy .


kuch galat hoke rahega ..

Last edited by MrAnderson; 30-05-2005 at 03:44 PM.
   
Reply With Quote
The Following 4 Users Say Thank You to MrAnderson For This Useful Post:
arindam83 (04-05-2007), neetugw (29-05-2007), sidcool007 (05-06-2008), varunbudde (30-05-2008)
Old
  (#15)
rajsher
has no status.
Addicted PaGaL
 
rajsher's Avatar
 
Status: Offline
Posts: 999
Groans: 0
Groaned at 1 Time in 1 Post
Thanks: 0
Thanked 8 Times in 8 Posts
Join Date: Jan 2005
Location: Hong Kong
Age: 25
30-05-2005, 03:29 PM

Quote:
Originally Posted by madhavi
Questions on Time and Work

2. A can do a job in 10 days. B can do the same job in 15 days. C can demolish the same job in 20 days. In how many days does the work get completed, if C starts the work and they work on alternate days as C-A-B-C and so on.
If we take this question as it is then answer is---

Day 1 - 0
next three days 1/10 + 1/15 - 1/20 = 7/60

so till 25 days work done is 56/60 and work left is 1/15

so the next day A will finish in (1/15)/(1/10) = 2/3 days

So answer 25 2/3 days


IN SEARCH OF A NEW SIGNATURE.........
Life me mazza kam ho raha hai.....kya kare?
COME n REGISTER on pagalguy.com

Last edited by rajsher; 30-05-2005 at 03:36 PM.
  Send a message via Yahoo to rajsher  
Reply With Quote
Old
  (#16)
madhavi
has no status.
Trainee PaGaL
 
Status: Offline
Posts: 68
Groans: 0
Groaned at 6 Times in 5 Posts
Thanks: 0
Thanked 31 Times in 4 Posts
Join Date: May 2004
30-05-2005, 03:29 PM

The correct answer is 25 2/3 days.



Quote:
Originally Posted by vkakkar
Is the answer of 2nd question "25 days".??
PLs let me know the correct answer so tht i can help.
   
Reply With Quote
Old
  (#17)
mr_quipster
has no status.
Expert PaGaL
 
Status: Offline
Posts: 105
Groans: 0
Groaned at 1 Time in 1 Post
Thanks: 0
Thanked 0 Times in 0 Posts
Join Date: May 2005
30-05-2005, 03:35 PM

Quote:
Originally Posted by madhavi
The correct answer is 25 2/3 days.
thoda vistaar poorvak batao devi


While we are all competing or dying, when will there be time for sex or music or books? Stop the world, I want to get off!!
_______________
Me @ EXCUZE ME!
My pictureworld @ FLICKR
   
Reply With Quote
Old
  (#18)
rajsher
has no status.
Addicted PaGaL
 
rajsher's Avatar
 
Status: Offline
Posts: 999
Groans: 0
Groaned at 1 Time in 1 Post
Thanks: 0
Thanked 8 Times in 8 Posts
Join Date: Jan 2005
Location: Hong Kong
Age: 25
30-05-2005, 03:39 PM

Quote:
Originally Posted by mr_quipster
thoda vistaar poorvak batao devi
C the post number 15 above.
If u dont understand then main thoda aur vistaar se bataa doonga
cheers,
Rajsher


IN SEARCH OF A NEW SIGNATURE.........
Life me mazza kam ho raha hai.....kya kare?
COME n REGISTER on pagalguy.com
  Send a message via Yahoo to rajsher  
Reply With Quote
Old
  (#19)
Zorro
has no status.
Newbie PaGaL
 
Status: Offline
Posts: 17
Groans: 0
Groaned at 0 Times in 0 Posts
Thanks: 0
Thanked 1 Time in 1 Post
Join Date: Dec 2003
30-05-2005, 03:41 PM

In 3 days..work done = 7/60.

The Catch: C Starts with Zero work.. so he has nothing to demolish.
so in day 1 C does Zero Work. so the Patter is ABC..ABC....

In 24 days.. work done = 56/60...
so work left is 1/15. and days passed is 25.

Time taken by a to complete 1/15 th of work is 10/15 = 2/3

ie 252/3 days... pls correct me


1/15...
Quote:
Originally Posted by rajsher
If we take this question as it is then answer is---

Day 1 - 0
next three days 1/10 + 1/15 - 1/20 = 7/60

so till 25 days work done is 56/60 and work left is 1/15
so next day, work left will be 1/15-1/20 = 1/60

next day a will finish in 1/6 days

So answer is 26 1/6 days
   
Reply With Quote
The Following User Says Thank You to Zorro For This Useful Post:
subhamita (05-06-2008)
Old
  (#20)
mr_quipster
has no status.
Expert PaGaL
 
Status: Offline
Posts: 105
Groans: 0
Groaned at 1 Time in 1 Post
Thanks: 0
Thanked 0 Times in 0 Posts
Join Date: May 2005
30-05-2005, 03:41 PM

Quote:
Originally Posted by rajsher
C the post number 15 above.
If u dont understand then main thoda aur vistaar se bataa doonga
cheers,
Rajsher
dhanyavaad mitr. abhi ke liey itna vistaar hi uchit hai. baaki vistaar fir kabhi karengey.


While we are all competing or dying, when will there be time for sex or music or books? Stop the world, I want to get off!!
_______________
Me @ EXCUZE ME!
My pictureworld @ FLICKR
   
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump

» Sponsors










PaGaLGuY.com is not responsible for the views and opinions of the posters.
PaGaLGuY.com is an Inzane Labs Private Limited production.
Hosted on servers powered by Neutral Web